Center loading: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
http://r2.greenindustrypros.com/files/base/image/GIP/2009/05/16x9/300x300/trxtrencherbackfillblade_10157200.jpg<br><br> | http://r2.greenindustrypros.com/files/base/image/GIP/2009/05/16x9/300x300/trxtrencherbackfillblade_10157200.jpg<br><br> | ||
Trencher with backfill blade.<br><br> | Trencher with backfill blade will allow for center loading.<br><br> | ||
Source: http://www.greenindustrypros.com/product/10157201/the-toro-company-trx-trencher-backfill-blade<br><br> | Source: http://www.greenindustrypros.com/product/10157201/the-toro-company-trx-trencher-backfill-blade<br><br> |
Latest revision as of 10:15, 10 July 2017
1. Backfilling the center of a pipe trench of an irrigation system, leaving the fittings exposed so that a pressure test can be conducted.
Trencher with backfill blade will allow for center loading.
Source: http://www.greenindustrypros.com/product/10157201/the-toro-company-trx-trencher-backfill-blade