Center loading: Difference between revisions

From PlantFacts
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
[[Category:Glossary]]  [[Category:Turf]]
[[Category:Glossary]]  [[Category:Turf]]


1. Backfilling the center of a pipe trench of an [[irrigation]] system, leaving the fittings exposed so that a pressure test can be conducted.<br>
1. Backfilling the center of a pipe trench of an [[irrigation]] system, leaving the fittings exposed so that a pressure test can be conducted.<br><br>
http://www.bunkershot.com/expo/Varicore/backfill.jpg<br><br>
http://www.bunkershot.com/expo/Varicore/backfill.jpg<br><br>
Golf course employees in the act of center loading<br><br>
Golf course employees in the act of center loading.<br>
Source:http://www.bunkershot.com<br><br>
Source: http://www.bunkershot.com<br><br>
 
<br>

Revision as of 13:31, 14 March 2006


1. Backfilling the center of a pipe trench of an irrigation system, leaving the fittings exposed so that a pressure test can be conducted.

backfill.jpg

Golf course employees in the act of center loading.
Source: http://www.bunkershot.com