Choker Layer: Difference between revisions

From PlantFacts
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:
https://d2j31icv6dlhz6.cloudfront.net/O/QvBdcKKc1.jpg<br><br>
https://d2j31icv6dlhz6.cloudfront.net/O/QvBdcKKc1.jpg<br><br>
The intermediate layer is also referred to as the binding or choker layer.<br><br>
The intermediate layer is also referred to as the binding or choker layer.<br><br>
 
Source: https://www.pitchcare.com/news-media/usga-golf-putting-green-construction-materials.html<br><br>
 
Source: https://www.pitchcare.com/news-media/usga-golf-putting-green-construction-materials.htmlhttps://www.pitchcare.com/news-media/usga-golf-putting-green-construction-materials.html<br><br>

Revision as of 11:12, 10 July 2017


1. A layer of coarse sand or fine gravel that separates the finer textured rooting media from the coarse drainage gravel when using the sand construction method.

QvBdcKKc1.jpg

The intermediate layer is also referred to as the binding or choker layer.

Source: https://www.pitchcare.com/news-media/usga-golf-putting-green-construction-materials.html