Cinder track: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Carroll.246 (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
1. A track constructed by spreading fine cinder or other fine [[aggregate]] material over a [[subbase]]. See also [[All weather track]].<br> | 1. A track constructed by spreading fine cinder or other fine [[aggregate]] material over a [[subbase]]. See also [[All weather track]].<br> | ||
http://www.kellermaterial.com/Red%20Dog%20Track%20Cinder.jpg | |||
http://www.rochdaleharriers.co.uk/Images/Summer1.jpg | |||
<br> | <br> | ||
The top picture is a close up of the material used while the bottem is a picture of the overall look of a cinder track<br> | |||
'''Source:'''http://www.kellermaterial.com/gravel_page.htm<br> | |||
http://www.rochdaleharriers.co.uk/trainingSummer.htm |
Revision as of 00:20, 27 February 2006
1. A track constructed by spreading fine cinder or other fine aggregate material over a subbase. See also All weather track.
The top picture is a close up of the material used while the bottem is a picture of the overall look of a cinder track
Source:http://www.kellermaterial.com/gravel_page.htm
http://www.rochdaleharriers.co.uk/trainingSummer.htm