Cuts: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
1. In the construction of a field of other facility, areas where soil is removed to achieve the desired contours, as opposed to "[[fills]]", which are areas where soil is added.<br> | 1. In the construction of a field of other facility, areas where soil is removed to achieve the desired contours, as opposed to "[[fills]]", which are areas where soil is added.<br> | ||
<br> | <br>http://tdigolf.com/images/Remodeling_Pics/Linville/Trapper%20Renovation%202.jpg | ||
Cuts for golf course construction<br><br> | |||
Source: http://tdigolf.com/sub/services/remodeling_pics/remodeling_linville.asp |
Revision as of 00:44, 27 February 2006
1. In the construction of a field of other facility, areas where soil is removed to achieve the desired contours, as opposed to "fills", which are areas where soil is added.
Cuts for golf course construction
Source: http://tdigolf.com/sub/services/remodeling_pics/remodeling_linville.asp